[1]
Mirković, M. and Mirkovic, M. 2026. The impact of the availability function on the structure of unit costs in a construction project: a case study. Journal of Road and Traffic Engineering. 72, 1 (Mar. 2026), 27-33. DOI:https://doi.org/10.31075/PIS.72.01.04.